hotline: 0512-68797659

LOCATION:HOME>>NEWS>>Industry information>>What does environmental protection check?
CONTACT
HOT TEL:0512-68797659

SuZhou Contamination Controls Technology Co.,Ltd

Tel: 0512-68797659

Fax: 0512-67084059

E-mail:yanfeng.chu@szccet.com

Address: design and R & D Center - Building 5, Daogu Internet Industrial Park, Wujiang District, Suzhou

Address: building 15, suhao Industrial Park, No. 105, tianshangjiang Road, Wuzhong District, Suzhou


Industry information
分享至:

What does environmental protection check?

Time:2020/04/22

  Environmental protection inspection mainly supervises 7 aspects:

  Including the implementation of air pollution prevention and control tasks by relevant local governments at all levels and relevant departments;

  Operation of environmental protection facilities with fixed pollution sources and discharge up to standard;

  "Elevated source" automatic monitoring facilities installation, networking and operation;

  Investigation and banning of "scattered pollution" enterprises;

  Implementation of measures to stop production and limit production in peak shifting production enterprises;

  Installation and operation of VOC related enterprise treatment facilities;

  Environmental protection supervision items and key points:

  1. Shall not build projects prohibited by the state?

  Main inspection: the "15 small" and "new 5 small" enterprises prohibited by the state

  Precautions and rectification list:

  Ban unconditionally

  2. It must not be a small scattered enterprise

  Inspection points:

  Whether it is in line with the production and layout planning and the enterprises whose pollutant discharge is not up to the standard.

  Enterprises with incomplete environmental protection procedures

  Whether it belongs to small manufacturing and processing enterprises such as printing, furniture, etc. that use organic solvents in brick and tile kilns

  Precautions and rectification list:

  The local government and the management committee will ban them all, and the enterprises will come as required

  3. Whether to obstruct environmental supervision and law enforcement

  Inspection points:

  Judicial interpretation of "two high" environmental protection: heavier punishment

  Precautions and rectification list:

  Enterprises must not obstruct environmental supervision

  4. The enterprise has environmental protection complaints

  Main inspection: no waste gas is discharged without permission, whether the pollution control facilities are simple and old, and whether the emission can reach the standard? Is the exhaust gas disturbing the residents?

  Precautions and rectification list:

  Solve environmental complaints before inspection.

  Now many problems are caused by complaints, and enterprises have to pay attention to them,

  5. Check whether the enterprise has environmental protection fraud

  Inspection points:

  Two high environmental protection judicial interpretation of environmental protection fraud, heavier punishment!

  Modifying parameters or monitoring data;

  Interference sampling

  Behavior of destroying environmental quality monitoring system

  Falsification of environmental assessment

  Precautions and rectification list:

  Enterprise credit is affected by punishment

  6. Whether the project has not been approved for construction first, whether the construction is inconsistent with the approval, environmental protection acceptance, etc

  Inspection points:

  Many inspections are based on the environmental assessment and approval, acceptance and acceptance documents of the Environmental Protection Bureau, from which we can see whether the main waste gas pollution production links and environmental protection measures of the project are consistent with the actual situation. Many data related to gas are also from the EIA and the official reply. We will also strictly check the situation of discharge without discharge permit

  Precautions and rectification list:

  The clean-up of environmental violations ended at the end of last year, and enterprises should not have any more problems in this regard

  7. Air pollution inspection:

  The treatment of coal-fired boiler

  VOC

  Dust

  stench

  Specification setting of exhaust funnel

  Unorganized emission control of waste gas

  Atmospheric protection distance and environmental sensitive points

  Inspection points:

  Coal fired boiler:

  Check whether the boiler of the construction unit meets the requirements. Whether relevant measures are taken, whether they should be closed and cancelled to check whether the treatment method for the continuous generation of combustible organic waste gas by chemical and petrochemical enterprises is reasonable, and whether it is reasonable to adopt recycling or incineration, and whether it is reasonable to adopt incineration, adsorption or combined technology for the intermittent generation of combustible organic waste gas.

  Check the inspection procedures and performance indexes of boiler combustion equipment;

  Check the operation of combustion equipment

  Check the control of sulfur dioxide and nitrogen oxide.

  Pollution sources of process waste gas, dust and odor

  Check whether the exhaust gas, dust and odor emission meet the requirements of relevant pollutant emission standards;

  Check the recovery and utilization of combustible gas;

  Check the environmental protection measures for transportation, loading, unloading and storage of toxic and harmful gases and dust;

  Air pollution prevention and control facilities

  Dedusting, desulfurization, denitration and other gaseous pollutant purification system

  Exhaust gas outlet

  Check whether the polluter has built a new exhaust pipe in the area where it is forbidden to set a new exhaust pipe;

  Check whether the height of exhaust funnel conforms to the national or local pollutant discharge standards;

  Check whether sampling hole and sampling monitoring platform are set on exhaust pipe

  Check whether the exhaust port is set according to the required specifications (height, sampling port, signboard, etc.), and whether the required exhaust gas is installed and used online monitoring facilities according to the environmental protection department.

  8. VOC: whether the waste gas is up to the standard and reduced, and whether there is adsorption device

  9. Key points of dust:

  Construction period of some projects

  Raw and auxiliary material storage yard

  transport

  Prevention and control measures

  10. Odor: whether the residents are disturbed and whether the measures are targeted

  11. Standard setting of exhaust funnel: whether it is set according to relevant requirements

  12. Unorganized emission control of waste gas

  Inspection points:

  For unorganized discharge points of toxic and harmful gases, dust and smoke, if it is possible to discharge them in an organized way, check whether the pollutant discharge unit has carried out remediation and implemented organized discharge;

  Check the dust of coal yard, material yard, goods and construction production process, whether the measures to prevent dust pollution have been taken or anti dust equipment has been set as required;

  Monitor at the boundary of the enterprise to check whether the unorganized emission meets the requirements of relevant environmental protection standards.

  13. Atmospheric protection distance and environmental sensitive points

  Check whether there are environmental sensitive points within the atmospheric and health protection distance as soon as possible, and whether there are complaints in key points, and solve them in time

  14. Waste gas treatment facilities

  Dust at dust collection point

  Whether there is secondary dust area in dust remover

  Whether there is ash emission and abnormal smoke on site

  Whether the operation point inspection and maintenance point inspection are in place

  Whether all records are normal

  Whether the inspection and maintenance work is carried out during shutdown according to the specified requirements

  Check whether the maintenance is in place

  Whether the equipment operation is maintained regularly according to the maintenance requirements

  Whether there is any abnormality or hidden danger, whether equipment failure or hidden danger is rectified in time